The pros dropped in Thursday afternoon and Friday morning and--BAM!--we've got a gas meter. Progress! Also, it turned out that the gas line is not under the asphalt, but rather just on our side of the road, so it was easy for them to dig down to it. They use a yellow "PEX" tubing and switch to galvanized iron just before the meter.
 |
| The gas main runs next to, not under, the blacktop |
 |
| The gas main is the black pipe at the left--they installed the yellow tubing. |
 |
| The bricks underneath are to keep it level as the plumber connects to the meter. They can go away when there's a second pipe holding the meter up. |
No comments:
Post a Comment