Friday, April 26, 2024

Color Consultant Anya Moller

I just found that I forgot to record Anya Moller's contact information in the blog. She created the exterior colors that we used, and I want to ask her for an interior palette.

Anya Moller
Architectural Color Consultant
Anya Moller Color Design
Voicemail: 206.947.3187
Email: amcolordesign@gmail.com

Posting this on September 5, 2024 (back-dating to my Yelp review of her exterior colors).

In November, I realized that I forgot to record the exterior colors!
  • Upper wall: Escape Gray
  • Lower wall and drip cap: Evergreen Fog
  • Trim: Origami White
  • Brick: Peppercorn

Wednesday, April 17, 2024

Painting

Working out the contract with Hate to Paint, I discovered co-owner Chris LeBeau is very flaky. He lives around the corner on 3rd Ave at about 117th. He said he'd come over in 10 minutes on two occasions and never showed. I haven't seen him since March. Co-owner Una Manushka, however, has been in touch. The issue was the extra charge to have them paint the soffits and fascia--I had planned to do it myself, but I changed my mind. Instead of an updated contract, Chris finally just said, "Uh, $2,000 more." 

Thursday, both Chris and Una said "We'll be there Friday morning at 9," so I prepped for a contract discussion--I didn't have the colors when the contract was first signed, and I now wanted to paint all the brick, not leaving out the living room.

Friday morning at 9, here's Una with Mona (a guy) and Tamir. Una doesn't want to talk contracts, he wants his crew to get started, which they do. Una and Mona came out Monday, 8 April, so Mona could pressure wash all around the house. There was some concern that he hadn't pressure washed the living room brick, but Una decided that they could wire-brush the green stuff off.

The patch at the old storage closet at the Laundry Room

Patching the brick veneer at the garage doors

I continued trimming the soffits, making repairs--such as at the metal plate the furnace installers left. Mona and Tamir returned Saturday, 13 April. Mona primed all the brick (except the post light) with white Loxon. Mona didn't want to paint the inside of the planter, but I insisted--I don't know when I'll have plants bubbling over the edge.

I think the brick looks great in white, but it will be Peppercorn. (As Una said, "Once you put the [Loxon] primer on, you can do anything." So Peppercorn is maybe not the final color.)

On Sunday, I excavated around the brick at the NE corner of the garage, replaced the old fascia board I could see from the kitchen window, and removed various nails and screws. I also tested and covered outlets in the porch ceiling (there's power switched with the porch light, but the outlet was dust) and the porcelain socket on the west side soffit (no power). The WP outlets at BR1 work (open ground), so I left them. I removed the porch light at the breezeway and was reminded that they installed it without a box. I should probably replace the fixture anyway.

Tamir on the ladder, Mona on the ground

My repair for the notch above the sheet metal patch
.
Prep work all around looks like this.

Removed the BR1 deck, then the painters prepped the wall.

When Mona and Tamir came back Monday, 15 April, Mona saw that I had not trimmed the west side soffit. "Too high?" he said and I said yes. "I'll do it," he said. I used up my supply of quarter-round--he measured, I cut. I set up the nail gun; he installed. It would have looked like crap with a wide bead of caulk, even though they're using "Big Stretch" caulk. It rained for an hour or so on Monday, but Tuesday was supposed to be dry. Tuesday, it rained between 8 and 9 and again between 1 and 2, roughly. Nevertheless, they began painting the fascia and soffits Origami White--it looks great.

Sunny weather is forecast for the rest of the week, and Una dropped by on Tuesday (during the rain) and mentioned he expects to be done by--I think he started to say this week, but he caught himself--early next week.

Monday, April 1, 2024

Roofing

We had aimed for 25 March, but rain was forecast. Tuesday, 26 March, was dry, but I had already agreed with Mauricio (aka Odilio) that we would target starting on 29 March. It rained Wednesday, when I gave Mauricio a check for 25% ($5,000 and change), and again on Thursday, when ABC Supply showed up and unloaded tons of shingles, rolls of CertainTeed Diamond Deck and other miscellany. 

Shingles delivered and stacked all over the roof.

But Friday, 29 March, was clear and sunny and Mauricio showed up with 3 helpers and got to work. The four worked 30 March as well, but not 31 March--that was Easter Sunday. They left the big truck parked here.

Mauricio was surprised by the extent of the rot and had to bring more lumber with him on Saturday. I was actually pleased that so much of the OSB sheathing was in good shape.



Notice the wide metal valley flashings on the ground

Monday, 1 April, Mauricio was back with one helper--I think it's his son. Only the three west side roof planes remained to de-shingle. The Diamond Deck is already up on most of the main house.


Mauricio and (I think) his son standing behind him, working over the front porch

CertainTeed Diamond Deck



Steps Project

I want to remodel the whole front yard. New hardscape, and so on. But at the moment, my path from the driveway to the house is only barely w...