The drawings are about done, ready to submit to the City of Seattle DPD. So we used the online Project Portal to submit the drawings, the geotechnical report, and the DPD Cover Sheet. With luck, the DPD response will be to schedule an intake meeting. I'm concerned that they will require structural calcs and details, so I didn't spend much time on that aspect of the plans and I'm working to line up a firm that can turn the project around quickly. Dibble Engineers is a possibility.
Update: Ken Jensen, the architect who took the palm tree, recommends Roland Heimisch of Kenmore, http://www.tecinstruct.com/,
Subscribe to:
Post Comments (Atom)
Steps Project
I want to remodel the whole front yard. New hardscape, and so on. But at the moment, my path from the driveway to the house is only barely w...
-
Anxious to make some forward progress, I thought, "What if I painted the garage?" If I decide to extend the garage, then some of...
-
Here's the massing of a garage at 15-degrees and an apartment above it. I have modeled stairs up each side of the 20x20 cube, because ...
-
Update 3/24 : Light green is emerging as the direction. This house (12036 9th Ave.) illustrates the vertical siding over horizontal shiplap...


nice! ;D
ReplyDelete