| Insulation complete |
I took an inventory of Needs and Haves for drywall. Need 17,200 square inches. Have 11,100 square inches. No matter what kind of Tetris games one plays, I need 6,000 more square inches (a 4'x8' sheet is 4,608 square inches), so I put out the bat signal for John Jones. Two sheets should be easy compared to the six sheets he helped me lug last time. Since I'm going to have a full sheet, I'll use it on the wall to the left in the photo above.
I feel a bit like Howard Roark in The Fountainhead, in that I've been feeling the cold air drafts as I've been working, and the fiberglass batts really are comfy cozy, like a blanket. Not just pencil and paper; I feel the architecture.
We're getting close to done. I didn't go to the home improvement store at all today. :-) I sanded the patch in BR3 and the final coat made a big improvement--there are still some imperfections visible in the LED side light, but I'm declaring victory.
Punch List
- Cut and install the various pieces of leftover drywall
- Install the perf angle to support the west-most garage door track--this will entail cutting the long angle.
- Apply tape to hide gaps in loft ceiling drywall.
- Install nail/screw organizers and power strip (blocking and drywall are in)
- Sweep and vacuum the floor in order to see imperfections
- Paint particleboard shelves
- Apply concrete floor patch as needed
- More primer: Prime the west garage door, the edge of the loft
- Buy garage floor paint (forget the laminate floor ideas)
- Wash the floor, apply acid etch, wash again
- Paint the garage floor
We're not done yet, but I can see the end. Just about a month, just about $1,100. Worth it.