Well, it's Sunday night again. I feel like I've been hardly working on the backyard. It started raining Wednesday night, persisted (sort of) on Thursday and a bit on Friday. I could have done lots of work in the dry times, or when it was just misting, but I just didn't feel like it. The lights dangled for a few days.
On Saturday, I hung the rest of the lights on the wire supports: 12 on the first (west-most) line, 11 on the middle, and 11 on the east-most line. I'm thinking I'll make that 11-12-11 by moving a light at the southern-most (spindly pine) tree.
I wonder where I got the idea that I could string the lights without wire supports? Could it be the sales material? Well, anyway, the $35 kit worked out just great--vinyl-coated, stainless steel cable with beautiful stainless steel fittings and turnbuckles. The connector at the southwest corner has to change, though--the wire is rubbing against the house, because I foolishly mounted it out of sight around the corner.
Sunday, I cut the remaining handrail pieces for the lower deck, including the sloping stair handrail. Making and fitting a template handrail out of salvaged lumber was a master stroke. The miters were wrong when I first cut them, and some had to be re-done twice. But when they were right, I had the precise angles and lengths so cutting the Fiberon handrails was easy. Also, I cut the end returns a couple of weeks ago--that was very tricky, because they come to a knife edge on two sides. So I super glued the returns on the cut boards and we're good to go on the handrails.
This project is nearing completion.
- Give the railings a second coat of black stain (may need more black stain)
- Install the angled cable rail on the lower stairs; it will be tricky
- Glue the handrail on the angled stair railing
- Glue the handrail on the other 5 sections
- Buy parts and install electrical for the lights
- Misc fixup--add blocking under unsupported deck end; add deck screws where needed; cut sharp corner of upper tread
- Install the remaining cable rail (7 panels x 8 rows)--112 pilot holes, 112 holes, 112 lag screws
- Move the wood piles to the front (side) yard
- Solve the basement stairs (a project in itself--to the drawing board!)
| Twilight; that's why you can still see everything |
No comments: