Week 1 and 2, I removed the decking boards. Getting a good look at the hot tub platform framing made me wonder why I wasn't renting a bulldozer. On the other hand, a lot of the railings volunteered their way off.
Week 3, I remembered my sledge hammer. Even if they didn't want to, the 2x12s and certainly the 2x8s disconnected themselves when the sledge hammer commanded it. On May 18, the hot tub platform framing was still there. By May 19, it was gone, and on May 20, I discovered the upper patio.
Week 4, I excavated the concrete steps (May 23) and on May 26, the junk pile was gone. Casey spent Week 2 in Tucson and Weeks 3 and 4 in quarantine. He missed a lot of the fun.
It's supposed to rain this weekend, so I (finally) applied the hose to the freshly uncovered concrete. Something of a mistake--because it's not all cleared yet, it doesn't drain. As I suspected, the lower patio is red concrete, but it's not very even and the thin layer of sand was hiding a number of cracks and imperfections.
| Ready for the rain. Hosing down means spreading the sand, but it's red. |
| A dozen wagonfuls of dirt will make this a smoother ramp, one day. |
| The upper and lower patios are flawed, but the steps are excellent. |


