I'm showing concrete bulkheads to strengthen the drainage swale pipe, then gravel from the street on either side of the driveway. The City of Seattle has a form for requesting approval to build in the street right of way--I think this is the sort of thing they'll accept. With two cars in the garage, two in front of the garage and four head-in from the street, we've got an 8-car party.
Need to come up with an approved "semi-permeable" driveway material.
I worked out that the new entry path is a gentle ramp. So is the path from driveway to west side deck to BR3. I show stepping stones at the entrance to BR4 (the former living room) because we need steps at the brick planter if the brick planter is to remain.
No comments:
Post a Comment